Skip to content
kiora systems
πŸ› οΈ Kiora Systems Β· Engagement guide 2027

Design the cooling. Skip the guesswork.

Kiora Systems is a thermal design consultancy for hardware teams building phones, tablets and small devices. We help you plan the cooling stack before the first prototype exists β€” and quietly fix the ones that already shipped.

See services Choose an engagement

🧭 Three ways to work with us

Advisory$2k–5k

A short, bounded piece of work β€” one review, one audit, one simulation of a design you've already sketched.

  • 1–2 weeks typical
  • Single deliverable
  • No retainer commitment
Project$8k–25k

A full engagement that carries a design from question to physical mock-up. You get a team, not a single consultant.

  • 4–12 weeks
  • Multiple deliverables
  • Weekly check-ins
Retainerfrom $3.5k/mo

Ongoing access to the bench for teams shipping every quarter. Priority queue, standing call, no re-scoping each time.

  • Month-to-month
  • Up to four active briefs
  • Pause anytime, 30 days' notice

πŸ› οΈ Services

Nine design and analysis services. Add any of them to your quote β€” the formal price comes after a short scoping call.

Simulation$6,500from

πŸ§ͺ Thermal Simulation Package

Full CFD and FEA of your proposed cooling stack under three sustained workloads. Includes hotspot maps and margin analysis.

10 business days
Review$3,200from

πŸ” Cooling Stack Review

A second opinion on an existing design. We read your drawings, spot the risks, and write a short list of changes worth making.

7 business days
Design$8,400from

πŸ“ Reference Architecture Proposal

We design a full cooling stack for your target thermal budget β€” spreader layout, materials, and a suggested BOM.

14 business days
On-site$4,800flat

🧰 On-site Thermal Audit

Two days at your site. We shadow a build, inspect line samples, and give a verbal readout plus a written summary.

Scheduled
Sourcing$2,400from

πŸ“¦ Vendor & Materials Sourcing

We recommend suppliers for spreaders, TIM and frames, and connect you with two or three at each tier with pricing notes.

10 business days
Build$5,500from

🧱 Thermal Stack Prototyping

Physical mock-ups of the cooling stack β€” enough to run in a test jig, not a full phone. Includes two revisions.

20 business days
Sprint$9,000from

⚑ Design Sprint Workshop

Five days with your engineering team. We bring the method; you bring the constraints. Ends with a proposed stack and a plan.

5 consecutive days
Training$1,200flat

πŸŽ“ Thermal Design Training

A half-day session for engineers new to thermal design. Slides, exercises, and a short handout you can keep.

Half day
Retainer$3,500/ month

πŸ” Monthly Retainer

Continuous access to the bench. Up to four active briefs, priority turnaround, and a standing 60-minute call each month.

Month-to-month

πŸ“¦ What every engagement includes

A written PDF report you can forward to your team
Raw data as CSV where measurements are involved
One call with the lead on the project
A named point of contact for follow-up questions
No up-charges for a second internal readout
Short handoff notes if you take the work in-house

🧩 Who does what

Every engagement is staffed from the four roles below. A dot means that role actively contributes to that capability.

Capability Simulation Hardware Materials Software
Heat pipe & vapor chamber layout
Chassis material selection
SoC thermal model
Software governor design
Vendor & supplier sourcing
Prototype build & test jig

πŸ‘₯ The bench

N
N. Ranvold Simulation lead
E
E. SΓΈrensen Hardware architect
P
P. Adeyemi Materials & sourcing
M
M. Ito Software & governors

πŸ› οΈ How a project runs

Step 01Scope

A short call. We agree what question you actually need answered, and what it's worth answering.

Step 02Work

We do the analysis, design, or audit. You get a mid-point check-in, not a black box.

Step 03Hand off

Written report, raw data, and a call to walk through it with your team. Nothing hidden in footnotes.

Step 04Stay in touch

Two weeks of follow-up questions included. After that, a retainer is the usual next step.